Asphalt paving
contractor in Phoenix
We pave, resurface, repair and maintain commercial asphalt across the Phoenix Valley. New lots, overlays, patching, pothole repair, sealcoating and crack sealing all start with a free estimate, and our estimators walk the lot before they price it.

Get a Free Estimate
Enter the details below and we'll get back to you with a free asphalt paving estimate.
What's Included in
Commercial Asphalt Paving
Asphalt paving covers the whole life of a commercial lot. That's the base and new surface on a build, the overlay that gives an older lot another cycle, the asphalt repair that fixes failed sections, and the crack sealing and sealcoating that keep the surface working. Each piece gets its own line in the scope, so you can see what you're paying for and why.



The question is never whether new asphalt looks better. It's whether the base underneath will hold it, so we walk the lot and mark the failing areas before we price anything.
Family Owned and Paving
Valley Lots Since 2001
YSC has been family owned since 2001, and we've spent those years paving, repairing and maintaining commercial lots across Arizona. We've already worked on a lot built like yours and watched how it aged, and that's most of what goes into telling you what it needs next.
Wherever we work in Arizona, you hear the same thing from us every time. If the base under a section won't hold, you find out before it's paved over, and you make the call.
YEARS IN THE VALLEY
ROC LICENSE NUMBER
COMMERCIAL PAVING STATEWIDE
FAMILY OWNED SINCE
Asphalt Paving Services
We Offer in Phoenix
Most lots need more than one of these over their life, and the right one depends on what the base is doing. Each service has its own page if you want the full scope.

Ground prep, aggregate base and new asphalt on a site that's never been paved, built to the civil plans and tied into the curb and drains. It's all part of our new construction site work.

When the base is sound but the surface is worn out, a new layer of asphalt goes over the top, often after milling so curbs and doors stay where they are. That's parking lot resurfacing.

Failed sections get cut out, the base gets fixed, and new asphalt goes back in flush with the lot around it. It comes before any overlay, and it's what we mean by parking lot repair.

Holes cut square, cleaned, tacked and filled with hot asphalt, then compacted so the patch stays put. One hole or a whole aisle of them, it's pothole repair.

A protective coat over sound asphalt that slows sun and water damage, usually every 2 to 4 years on the manufacturer's schedule. That's sealcoating.

Cracks cleaned and filled with hot sealant before water reaches the base, typically every 1 to 3 years on a working lot. That's crack sealing.
Properties We Pave Across
the Phoenix Valley
A community road and a loaded truck lane both need asphalt, but not the same section. We scope the pavement around how the property actually gets used.
Community roads and parking bays paved, overlaid and maintained on a reserve schedule, phased so residents keep a way in and out.
Drive aisles fail long before the parking bays, so the paving usually gets staged by zone and scheduled around store hours.
Industrial Yards
Truck lanes and loading areas that need a heavier section than the car parking, on a base that'll carry it.
New Construction
New lots and drives paved once the site work's done, on a base built for the pavement going over it.
Schools & Municipal
Campus lots and bus loops paved inside a summer window, to MAG and the city supplement the parcel sits under.
Storage & Truck Yards
Large open areas where tonnage drives the budget, so thickness in the right places is the whole conversation.

What to Look For in an
Asphalt Paving Contractor
Most of what separates a good paving bid from a bad one never shows up in the number. These are the six things we'd check if we were the ones hiring.
An aerial photo can measure the lot, but it can't show how the cracking, drainage and traffic are wearing the pavement. Somebody should have walked it before pricing it.
Those are different jobs at different prices. If the bid doesn't say which one you're buying, ask, because the wrong fix on a failing base gets paid for twice.
New asphalt has to tie into curb, gutter, concrete and drains. Where a bid says nothing about transitions is where the lip and the puddle turn up later.
Most lots have a few sections too far gone to pave over. A bid that covers everything at one price is either more expensive than it looks or wrong about the base.
Ask for the compacted thickness and the tonnage behind it. Across a large lot, a small cut in thickness is a lot of asphalt and an easy place to shave a bid.
Ask how a change gets priced and approved once the work starts, and get the answer in writing before a section opens up wrong.
Get an Asphalt Paving
Bid You Can Trust
You send the lot out and three numbers come back nowhere near each other. The low one looks good until the crew finds a base that won't hold, and then the change orders start. Most of that gap comes from one thing.
Nobody agreed on the scope. One bidder priced an overlay, another priced patching and a seal, and a third priced new paving on half the lot. Those are different jobs at similar looking prices.
You don't have to take the higher bid. You do have to make every bidder price the same scope, with the thickness and the repair areas written down.
A YSC estimator walks your Phoenix lot before pricing it, and you see what we found.
Repair areas, paving thickness and estimated tons are written into the bid as their own lines, so you can compare bids line by line.
Itemized by area so a property manager, an owner or an HOA board can see what each zone costs and stage it across budget years.

What We Look For on Your Lot
We read the cracking pattern, check where the water sits, look at what the traffic is doing to the aisles and note where the surface points to a base problem. If a section looks like base failure, we'd rather flag it now than after the new asphalt is down.
You get a written scope you can hand to every bidder, whether or not that's us.
Our Process for
Paving a Commercial Lot
Four steps, built around keeping the property open. You'll know which zone closes when, and what the lot looks like at the end of each day.
We walk the lot, map the failing areas and tell you whether it needs new paving, an overlay, repair or maintenance.
Every area gets its own line and the lot gets a closure plan, so tenants and residents always have somewhere to park.
Failed areas fixed first, then the new asphalt placed and compacted to the thickness in your scope.
Layout restriped to the plan your property calls for and the zone handed back on the day the schedule said.
Our Experience
Across the Valley
The same sun beats down on every lot from Peoria to Mesa. What changes is who's paying for the pavement and how they need the work planned.


Portfolios where paving has to be staged across budget years, with the worst lot named and a reason given for the order.

Assets being built, held or sold, where the pavement is part of how the property shows and what ends up in the inspection report.

Reserve-funded work that has to be explained to a board, so the bid has to read as clearly as it prices.
Phoenix, Mesa, Gilbert, Chandler, Scottsdale, Tempe, Glendale, Peoria and Apache Junction.

Why Choose YSC for
Asphalt Paving
Property managers don't switch paving contractors for fun. They switch because new asphalt went down over a base nobody checked, or because the lot was closed a week longer than they were told it would be.
Estimates start with a YSC estimator walking the lot, and you keep the written scope whether or not you hire us.
Base condition gets looked at on your lot rather than assumed from the year it was built, so the bid is priced against what's there.
Lots that have to stay open during the day can be worked at night or on weekends, phased so tenants and customers keep parking.
Sections, compaction and mix follow MAG Standard Specifications and whatever city supplement the parcel sits under, on every project.
Every bid breaks out repair, paving, tonnage, striping and traffic control, so you can stage the work instead of deferring all of it.
Working Maricopa County sun, monsoon runoff and Valley summers since 2001.
Phoenix Asphalt Paving
Questions, Answered
The old surface is removed or prepared, the subgrade is graded and compacted, aggregate base goes down, then hot mix asphalt is placed and rolled in lifts. Striping and finish work close it out. Each step affects how long the lot lasts.
It depends on the lot's size, whether the base needs rebuilding, and how many phases the property needs. We give you a written schedule by zone instead of a single number over the phone.
Fresh asphalt takes traffic once it has cooled and compacted, which can be the same day in Phoenix heat. We tell you the reopening time per zone, and we barricade until a zone is ready.
Yes. Lots are paved in zones, so tenants, customers and residents keep parking. Night and weekend work is available for properties that can't close during the day.
Price depends on square footage, subgrade condition, access, drainage, thickness, phasing and traffic load. A single figure wouldn't be honest, so we price from the lot and give you a written number.
Square footage, base work, asphalt thickness and tonnage, drainage corrections, striping, and the schedule by zone. Ask every bidder to write these down so you're comparing the same job.
Different assumptions. One bidder may include base repair, thicker asphalt or phasing, and another may leave them out. The cheapest bid often has the thinnest scope.
We tell you what we find before more work goes in, with a number. No bid can see under pavement, so the honest version is calling when we know.
If the base is sound, an overlay can restore the surface. If coring comes up soft or cracking is a connected network, the base has failed and the lot needs remove and replace. A walk of the lot and, where it is needed, coring tell us which one.
Yes. Where new asphalt meets old, we saw-cut the existing edge back to sound pavement and set the new grade to match, so water runs across the joint instead of sitting in it. A clean vertical cut and a tack coat help the two bond, which keeps the seam from being the first place the lot opens up.
On a well-built base, a commercial lot lasts a long cycle, and sealcoating and crack sealing on schedule are what get you the top end. Subgrade, drainage, traffic load and climate all affect it, so we don't put a number on it.
Yes. We grade and pave as part of site packages, with the subgrade work and the paving handled together on jobs we run.
Yes. Hot mix is placed and rolled in Arizona summers, and crews adjust start times for the heat. Rain and monsoon storms are what move paving days.
Asphalt can't go down on wet ground, so we stop and reschedule the affected zone. We watch the forecast through monsoon season and tell you early if the schedule shifts.
As early as you can. Send us your fixed dates with the request and we'll work back from them, since cure times and zone phasing determine the plan.
New asphalt needs time to cure before it takes sealer. We'll advise when your lot is ready rather than sealing too early and having it peel.
Yes. Striping goes down on the new surface, including accessible stalls and aisles to the layout on your plans.
Crack sealing as cracks appear, sealcoating on a cycle, and repairing failures early before water reaches the base. We can set up a maintenance plan around your budget year.
Asphalt Paving Services by City
New paving, overlays, repair and maintenance across the Phoenix metro. What changes city to city is the ground under the lot and the window the jurisdiction will let you work in.

Older central lots on two or three generations of asphalt, where the base decides overlay or rebuild.

Flat East Valley lots where the water sits, so getting the grade right matters as much as the asphalt.

Price Corridor campuses paved around shift changes, where the drive aisles go first and the bays can wait.

Community roads paved and maintained on a reserve cycle, phased so residents keep a way in and out.

Resort and retail properties where the finish is part of the address, so edges and transitions get cut clean.

Older campuses near the university, usually milled first because there's nowhere for the grade to go against existing curb.

West Valley industrial lots where truck lanes need a heavier section than the car parking around them.

Newer properties where crack sealing and sealcoating now keep a sound lot from needing a bigger fix later.

Steeper east-side ground where runoff moves fast, so new pavement has to hold the fall rather than flatten it.
Services We Handle Alongside Paving
Paving is one part of the site. Here's the work that comes before it, goes in with it, and keeps the lot working afterwards.
Damaged areas cut out and replaced, from a single failed section to a run of base failures along a drive aisle. That's our asphalt repair work.
New asphalt covers your layout completely, so striping is part of the job rather than an option. It's also the easiest moment to change the stall count or rework the layout.
New paving is only as good as the grade and base under it. On new builds and full rebuilds, the dirt work comes first.
Where water has sat in the same spot for years, new asphalt will sit in it too. Fixing the fall is what makes new pavement last.
Get a Free Estimate on Your Lot
It costs nothing, and you leave knowing whether your lot needs new asphalt, an overlay, repair or just maintenance.
