
Commercial asphalt contractor serving Chandler, AZ
Chandler built most of itself in about thirty years, which means most of its asphalt went down around the same time and is now reaching the same age. Every Chandler bid starts with an estimator walking the lot.
Tell us about the property and we’ll get back to you with a free estimate.
Commercial paving in Chandler, AZ
Chandler pavement is younger than most of the Valley, so the question here is usually timing rather than triage. Seal it while the base is still sound, overlay it when the surface is spent, patch only the sections that have failed, and restripe when the work is done. One contract covers all of it, from the bid to the final walk.

The cheapest work on a Chandler lot, and the most time-sensitive. Sealing the cracks keeps water out of a base that is still good, which is what keeps a 20-year-old lot from becoming a rebuild.

A new mat over a base that still carries load, which on lots platted in the 1990s and 2000s is often the right call. Where the base is finished, it comes out and the lot is repaved.

Cut out and rebuilt where the base has given way, surface patched where only the top has worn. On a younger lot, patching the few failed areas often buys years before anything bigger is needed.

The last step on a paving job: stall layout, directional arrows, fire lanes and accessible parking, painted to the plan you approve.
Which one your lot needs depends on the base, and the base is not something you can judge from the surface. That is what the free estimate is for, and it starts with an estimator walking the lot.

Family owned and operated
YSC is Young, Swenson & Cross Paving, working out of 1329 E Gibson Ln in Phoenix, a clear run down the 101 or the I-10 to anywhere in Chandler. Your job is managed from the first visit to the closing walk.
Asphalt services in Chandler, AZ
Every one has a page of its own with the detail. Here is the short version of what each does, and the point at which a Chandler lot needs it.

Seal wears away in this sun, and it is the least expensive work on a lot. It keeps water off the surface and holds the flex that lets a mat carry load through August, which is only worth doing while the base beneath it is still good.
Sealcoating details →
Water gets in through the cracks and almost nowhere else. Close them and the base stays dry. Leave them through one monsoon and you are buying patches instead.
Crack sealing details →
A fresh mat laid over the existing surface where the base is still sound. Quicker and cheaper than tearing it out, but only once somebody has checked the base.
Asphalt overlay details →
Full depth removal where the base underneath has gone, surface patching where only the mat has. Knowing which of the two you have is what stops the same hole being filled twice.
Asphalt patching details →
Out to subgrade, recompacted, and a new mat laid where the base is beyond saving or the site is being rebuilt. The full job rather than a resurface.
Asphalt paving details →
The spots taking the most punishment give out first. Dumpster pads, the sag around an inlet, the aisle every delivery truck turns in. Whatever bays we open get repainted so the repair does not stand out.
Parking lot repair details →Properties we serve
Chandler’s parking is weighted toward two things the rest of the Valley has less of. Very large employer lots along the Price Corridor, and a wall of 1990s and 2000s HOA communities whose private drives are all coming due at once.
Lots sized for four-figure headcounts, where a closed row is a real problem for a shift change. Phased by section, run around the shift pattern, never all at once.
Commercial paving →Private drives, guest bays and resident spaces across the master-planned communities, sequenced so no door is ever blocked, with the notice letter and schedule supplied for the board.
HOA paving →Storefront parking with no closed week available. We work a section at a time, hold the frontage aisles open, and put the striping back to the layout you sign off on.
Retail center paving →Thicker sections, heavier loads and turning trailers, particularly around the airpark and the industrial parks east of Arizona Avenue.
Distribution center paving →Bus loops, drop-off lanes and staff parking, nearly all of which has to land in a summer or a break. Booking months ahead is what secures it.
School paving →Empty for most of the week and full for one or two mornings. That makes the work easy to schedule around services.
Church parking lot paving →
What is different about Chandler
Six things that show up in a Chandler price.
Chandler had 9,531 people in 1960 and about 288,000 today. Of the 2,011 subdivision plats the city has on record, 52 percent were recorded in the 1990s and 2000s, and 66 percent were recorded in 2005 or earlier. A huge share of Chandler’s asphalt is hitting 20 to 25 years at the same time, which is exactly when the original mat gives out. Counted from the City of Chandler’s published Subdivisions layer, which carries a recorded plat date on every parcel.
On lots this age the base is often still sound and the surface is what is spent, so an overlay does the job at a fraction of removal and replacement. It only holds if the base is sound, so the estimator reads the failures on the walk and tells you when the job calls for coring.
The city works to the MAG Uniform Standard Specifications plus its own Specifications & Standard Details, the supplement to MAG, and its Engineering & Design Standards Manual. A bid written to MAG alone can still miss what Chandler wants on a detail.
Work in the right of way runs under a permit, and the traffic control has to follow Chapter 7, Traffic Barricade Design, in the city’s Engineering & Design Standards Manual. We build the schedule around the review rather than promising a start date we cannot hold.
Chandler’s largest employment district packs about 42,000 jobs into 5.7 square miles along Price Road, with seven employers over a thousand people each. Those lots cannot give you a quiet week, so the work goes in by section, at night or across a weekend, with the drive aisles and accessible parking kept open throughout.
Chandler is boxed in by Tempe, Mesa, Gilbert, Phoenix and, along the whole southern boundary, the Gila River Indian Community. If your property sits near that line it is worth confirming whose permit applies before anyone schedules a crew.
The bid
Ask three contractors to price the same Chandler lot and the spread tends to surprise people, almost always because they are quoting different amounts of work. Ours breaks the scope out line by line so an owner or a board can see what the money actually buys.

On Chandler lots this is the whole question. The estimator walks the failures, tells you which way the lot looks and whether it needs coring to settle it, because the difference between the two answers is most of the price.
Areas, depths, how many patches, how many stalls, what the city paperwork costs, and a plain list of what we are not doing. A lump sum gives you nothing you can check.
Which sections run on which days or nights, how the lot stays usable while they do, and where staff or tenants park in the meantime.
The estimate
Every bid starts with an estimator walking the lot. The overall square footage comes from aerial imagery, so on site we spot check the measurements, mark where the surface alone has gone against where the base has, read the falls around the inlets, and record the striping and stall layout as it stands.
The scope arrives in writing.
It spells out what is in the price and what is not, before you commit to anything.
Get a Free Estimate →
The process
Four stages, with a contact at every one. Tap any stage for the detail.
Experience
We cover Chandler from the airpark and the industrial parks to the Price Corridor and the HOA communities in the south.

The parts of Chandler we are in most weeks, running north to south. Everything between them is covered as well.
The historic square and the streets around it, where parking is shared, metered and never quiet for long.
Chandler’s largest employment district. Campus lots sized for thousands, phased around shift changes.
Regional retail off the 101, where a closed row on a weekend costs a tenant real money.
North Chandler, long established, with private drives and water features to work around.
Central Chandler, 1990s HOA parcels whose drives and aprons are all aging together.
The largest master-planned community in the city, with golf, lakes and a lot of private drive.
South Chandler, newer parcels where the work is still maintenance rather than rebuild.
Southeast, around the municipal airport. Industrial frontage, truck movements and heavier sections.
Southeast Chandler on the Gilbert line, 2000s parcels reaching their first real maintenance cycle.
The far south of the city near the community boundary, residential drives and common-area parking.
Most weeks that means Chandler, Gilbert and Tempe, with the rest of the metro beyond them.
See service areas →
Why YSC
Six things Chandler companies get from us.
Long enough to have watched how pavement sections hold up across decades of desert summers.
Section maps and notice letters come with the bid, so tenants and staff know which area closes on which day.
The people who walked your lot and wrote the scope stay with the job while it runs and sign it off at the end, so nothing is lost in a handoff.
Our bids are written to the MAG specifications and to Chandler’s own supplement and design standards manual.
The list of what the price does not cover, which is the page most bids leave out. Change orders almost always live in that gap.
Grading, paving, seal and striping under one contract, so nothing falls between two trades.
FAQ
Mostly about timing, cost and who has to sign off. Anything not covered here, call (602) 254-7474.
That is the most common question in Chandler, because so much of the city was platted in the same two decades. If the base is still sound, an overlay gives you a new surface at a fraction of the cost. If the base is wet or gone, an overlay only buys a year or two before the same failures come back through. The estimator walks the failed areas and tells you what the surface shows, and if the base is still in question, coring goes on the quote as its own line item.
It turns on whether the failure sits in the surface or the base. Tight cracking, faded color and a coarse top are surface problems, and seal plus crack work deals with them. Pavement that gives underfoot, holes that reopen after patching, and cracking broken into interlocking plates all mean water has reached the base, and sealing over that does not fix it.
Only the section being worked, and only for as long as that stage takes. Fresh seal keeps its section closed for 24 hours, up to 48 in summer heat. A patch hands the bay back the same afternoon. Fresh mat needs longer before loaded traffic crosses it. Which section runs on which day is written into the bid rather than decided on the morning.
Often, and on the Price Corridor campuses and the retail centers it is usually the better answer. It depends on the tenant mix, the residential neighbors and what Chandler allows for hours and noise at that address. We check before we promise it rather than after.
It shifts with the calendar. Spring and October fill first because seal work bunches into those weeks, and school lots compete for the same summer and break weeks. Give us the address and we will tell you the window we can actually hold.
There is no honest square foot number that covers it, because the same lot prices very differently depending on whether it needs an overlay or a rebuild, how many phases it takes to stay open, and whether any of the work sits in the public right of way. We take the square footage off aerial imagery, spot check it on the lot, and give you an itemized scope with the exclusions on it, at no cost, so you are comparing real numbers.
Nearly always because it covers less. Check the patch depths, whether failed areas are priced as removal or quietly rolled into an overlay, the striping counts, the permit and barricade line, and the exclusions. A bare total with no breakdown usually catches up with you as a change order.
No. The estimate is free, and so is the site walk. You get the scope in writing either way.
Yes. A good share of our Chandler work is billed to management companies and HOA boards, and the scope is laid out so a board can vote on it without sending anyone back for a second look.
Work entirely inside your own lot is different from work that touches a public street, a sidewalk or the right of way, and the second kind runs under a city permit with traffic control built to Chapter 7 of the Engineering & Design Standards Manual. We identify what your scope needs and pull it. Chandler Development Services is at 480-782-3074 if you want to confirm anything yourself.
The MAG Uniform Standard Specifications, plus the City of Chandler Specifications & Standard Details, which is the city’s supplement to MAG, and the Chandler Engineering & Design Standards Manual. The supplement is the part an out of area contractor tends to miss.
The enemy is water, not heat. Paving and patching carry on through summer with early starts. Seal and crack work need dry pavement and a dry forecast, and with the monsoon running June 15 to September 30 that pushes them into spring or from October onward.
Service areas
Four cities press against Chandler, so a crew down here is rarely more than a few minutes from another of them. A portfolio spread across those lines can run on one contract.

Chandler’s northern neighbor, and the opposite problem. Built out since the 1970s, so the pavement is older.
Tempe paving →
Directly east, and on a similar growth curve, so the maintenance timing questions are much the same.
Gilbert paving →
Wraps Chandler’s north-east corner. Old lots on the west side, new industrial toward the 202, not much between them.
Mesa paving →
Where the yard sits, off Gibson Ln near Sky Harbor, and a clear run south into Chandler.
Phoenix paving →
Up past Tempe, where how a finished lot looks gets weighed about as heavily as how it performs.
Scottsdale paving →
Out past Mesa on the east edge of the Valley, where lots see heavy vehicles and very little shade.
Apache Junction paving →
Related work
Few Chandler jobs are asphalt on its own. These are the services that usually come with it, and one contract keeps them working to the same plan.
Everything that happens below the mat. Earthmoving, compaction tested to spec, and the grades that decide where water goes the next time it rains.
Planned rather than reactive. Crack seal, seal coat and striping on a fixed cycle, priced far enough ahead to sit in a budget.
The dumpster pad, the sag around an inlet, the aisle every truck turns in. Fixed where it failed, before it spreads.
Seal, crack work and patching on a schedule, so a young lot stays a maintenance job rather than a rebuild.
Send the address and a note on what is failing. We walk it and measure it, then come back with a written scope.
