Asphalt Paving and Sealcoating FAQs
Answers from the YSC team to the questions owners and property managers ask most about asphalt paving, sealcoating, repairs and scheduling. Each answer links to a short video of the YSC team explaining it.
Yes. Call the office or send the property address through the form, and an estimator usually reaches out within 24 hours to talk through the project. The estimator walks the property, ideally with the owner or property manager, looks at the pavement and goes over a few options for repairing or maintaining it, along with any budget or schedule limits you have. The written estimate typically follows within two to three days.
It depends on what the lot needs. A sealcoat job and a full asphalt reconstruction sit at opposite ends of the scale, and most projects fall somewhere between. That is why YSC sends an estimator to look at the pavement, find out what work is needed and lay out the options before quoting a number.
Yes. Owners often ask for budgetary numbers on a large project planned 12 to 24 months ahead. YSC prices it at current asphalt market rates, then updates the proposal before the project starts, because liquid asphalt, fuel and labor costs move up or down in the meantime.
No. On one site where the asphalt had alligator cracking across the whole lot, the owner expected a full replacement costing far more than he had planned. The better plan was to remove and replace the drive lane and overlay the parking stalls. YSC has done that combination successfully many times. It still costs real money, but less than a full replacement. When pavement is too far gone to save, though, spending on patches is money wasted.
The biggest one is not being clear about what they will get. Some buyers have a set budget, some just want the problem fixed, and some hire a consultant who writes the scope. In every case YSC asks enough questions to know what you expect, and explains exactly what each paving option delivers for the money. The goal is that you walk outside when the job is done and see what you expected.
Sometimes crews uncover conditions nobody could see at bid time, like soft base or a utility problem, and the job needs extra work. The foreman or superintendent reports it to the estimator and project manager, who write a change order describing the added work and its cost. YSC reviews it with you, and the extra work goes ahead once you agree to it.
Typically two to four weeks after the work is approved, depending on the schedule at the time.
YSC plans around it. Before the job starts, YSC meets with the owner to go over business hours, events and anything else that cannot be disrupted. Sometimes that means splitting the parking lot in half so customers can still get in. Other times it means working weekends or nights.
Sealcoat has to cure before cars can drive on it, so sections of the lot close for a while. Those logistics put some communities off the project. YSC holds a pre-construction meeting with the property manager or HOA to plan how to phase the work, and can provide phasing maps to hand out to residents or tenants.
It starts with an estimate to confirm the lot needs removal and replacement. Once the price is agreed, YSC holds a pre-construction meeting to review the scope, schedule and anything that has to happen before crews arrive, such as utility locates. On site, the old asphalt is either dug out or, on bigger lots, milled into small chunks and hauled off. A roll test then checks the base for soft or wet spots, and anything found is reported to the owner. Crews finish-grade and compact the base, pave, and keep the lot closed for 24 hours. Striping and signage follow the next day.
It begins with engineered plans. YSC does the takeoff and bids the job, and once awarded, holds a pre-construction meeting with the general contractor or owner to confirm who provides what. Then the site is cleared and grubbed, survey sets the construction limits, and mass excavation runs one to three weeks depending on site size. After the building pads are approved, YSC grades for curb, gutter and sidewalk so the concrete scope can be completed. Crews then prep the subgrade, pass a compaction test, bring in and process ABC base, and pave. The lot stays closed for 24 hours to cool, then gets striped and signed, and utilities like water valves and manholes are adjusted to grade.
YSC follows industry guidelines and checks the temperature of every load delivered. Asphalt should not arrive below 260 degrees or above 310 degrees.
Stay off new asphalt for at least 24 hours. In an Arizona summer, the heat can mean it needs 48 hours to cool and cure properly. Sealcoat is usually the same, with the area closed for 24 hours, and up to 48 hours in extreme heat.
Common marks on fresh pavement are tire marks from cars driving on it too early and scuffs from trash trucks or even a bike. Many of them fade on their own as the pavement takes traffic. If one does not, YSC can often come back soon enough to heat the area, rake it and roll it back in. If too much time has passed, the area may need to be milled down an inch to an inch and a half and repaved.
With proper maintenance, new asphalt typically lasts 20 to 25 years. That starts with the first sealcoat 12 to 18 months after paving, then maintenance about every three to five years. Without it, YSC commonly sees asphalt fail around 10 to 12 years and need full removal and replacement. A sealcoat itself typically lasts three to five years.
Replacing asphalt is a big investment. Picture two lots paved at the same time. The owner who keeps up with crack sealing and sealcoat every three to five years can expect 20 to 25 years from the pavement. The owner who skips maintenance often needs a full replacement in 10 or 12 years, and sometimes sooner on a high-traffic lot.
It depends on how hard the lot is used. An apartment complex with traffic all day may need maintenance every three to five years. A large commercial property that is only partly leased, so the lot sees about half the use, may go five to seven years between treatments.
Over time asphalt dries out and sheds its fines, and without maintenance it crumbles. Sealcoat puts oil back into the surface, which helps bind the fine and large aggregates together and extends the life of the pavement.
Several things: oil stains and leaks from vehicles, heavy traffic or heavy loads, intense sun, water washing the fines out of the asphalt, and above all a lack of maintenance.
An unstable base. A utility leak under the pavement, or water getting under a lot that has not been maintained, softens the base material. As traffic passes over, the base flexes and sinks. Asphalt can only flex so far, especially once it has dried out and turned brittle, so it breaks into the interlocking pieces that look like alligator skin.
The most common is remove and replace. Crews mark and saw-cut the area, remove the asphalt and inspect the base for problems like a utility leak. Once the base is solid, they spray the edges of the existing asphalt with CSS-1H tack so the new asphalt bonds to it, then place and compact the new asphalt. The other method, often used on potholes, is a surface patch with no removal. Crews clean the area thoroughly, tack it and the surrounding pavement, then place and compact new asphalt.
Both are wearing surfaces laid over existing asphalt. Sealcoat is a thinner asphalt emulsion with sand, and it suits lighter-traffic areas like parking lots and community streets. Slurry seal is thicker and carries much more aggregate. It was designed for low-speed, high-volume traffic, like residential city streets.
Usually not. In a parking lot, slurry tends to scuff and shed loose rock, which creates a mess, a slip hazard and a lot of sweeping. Slurry also lets the cracks underneath show back through within a short time, so it does not hide a worn lot for long. The best way to choose is to have a YSC estimator look at the condition of your asphalt and recommend the right product.
Have a question about your own property? Get a Free Estimate or call (602) 254-7474.