What Is The Process Of Laying Down Asphalt?

5-10

The decision to have an asphalt driveway installed at your home is a financial investment. This financial investment should provide the highest quality of work and materials from the best Youngtown asphalt contractor. There is a process of laying down asphalt and a qualified asphalt contractor should follow this process so the homeowner gets the proper asphalt needed for their driveway.

The steps that are involved in laying down asphalt include:

  • The ground needs to be strong for the asphalt to be structurally sound. The foundation may need to have stones added to the ground so it can provide a sturdy foundation. If the foundation has a soft grounding material or stumps and roots, then this all must be removed first, then stones can be added to the area.
  • The foundation is one of the most important features of the asphalt. Gravel is added to the foundation to create the sub-base. The gravel will allow for drainage of water from the asphalt, along with providing support for the asphalt. The sub-base is rolled with a vibrating roller that will compact the sub-base. The compaction should be around two to three inches of sub-base thickness. The sub-base can’t be soft or unleveled, as this will affect the asphalt completely.
  • The hot asphalt is now ready to be laid. The hot asphalt is laid on top of the sub-base, and then rolled evenly. The surface has a paver and roller go over the asphalt so the asphalt is distributed evenly and compacted at the same time. The edges are hand tamped at a 45 degree angle so it provides the support needed for the asphalt.
  • The asphalt is laid and the crew will block off the asphalt so that nothing and no one is able to drive or walk on the asphalt.

The process of laying asphalt sounds pretty easy, but there is a lot of detail and hard work that goes into laying an asphalt driveway. Being an asphalt worker requires determination, craftsmanship, and dedication, as this is a hard and tedious profession, but the rewards are unlimited.

An asphalt contractor can do a regular sized driveway in two days. One day is used for getting the foundation and area ready for the asphalt and the second day is the actual laying of the asphalt. You will be able to walk on the asphalt 24 hours after the asphalt is completed. You can park and drive on the asphalt three days later. The process for asphalt is not quick, but the wait is worth it in the long run.

Glendale Asphalt Maintenance Helps Pet Store’s Clientele

A Glendale pet store had a lot of loose asphalt and big chunks of gravel all over their parking lot. This type of gravel and rock was starting to effect the dogs whose owners brought them into the store. The pet owners would arrive at the store and when the dog owners would walk their dogs inside the dogs’ paws were getting hurt due to the condition of the parking lot. The store owner was, of course, horrified when he heard this was happening (being a dog lover himself and owning a pet store), so he contacted the best Glendale asphalt company to come and fix their lot that needed maintenance and immediate repairs. The best Glendale asphalt company for the job was obviously YSC Paving.

When we heard about the condition of the parking lot in Glendale and what it was doing to the dogs we scheduled a meeting that same day as we all here at YSC are animal lovers as well. The crew arrived at the store and inspected the parking lot. We recommended patching, crack sealing, and then sealcoating. These maintenance and repairs would get the lot back in great working condition that would be safe and durable. The owner agreed, and wanted us to start quickly, so our crew returned that afternoon and started the project. It took the YSC crew several days, but we finally finished and the parking lot looked outstanding. The customer was overjoyed to see his new parking lot. He said he will now call YSC for his asphalt maintenance Glendale pet owners would enjoy.

How Can I Tell If A Quality Job Was Performed On My Asphalt Project?

The factors that can determine quality work relates to the experience that you have had with the contractor and the crew, the equipment used to perform the project, the skill set of the contractor and the crew, and the value each and every worker sees in each project they complete.

A Phoenix asphalt contractor will want to have a good working relationship with the owner from the time that the contractor meets the homeowner to go over the asphalt project, until the time the contractor is cleaning up the area and presenting the final bill to the homeowner.

The contractor and the crew will provide quality materials that are being used for the asphalt project. There will be no short cuts on quality materials for the customers. The contractor and crew will work hard and provide quality asphalt for you. The crew and contractor should go that extra mile to make sure that you are pleased with the asphalt project they are completing for you.

The crew will be able to use heavy equipment that has been maintained and been properly taken care of. They will all be qualified and skilled in the asphalt industry. The contractor will make sure that the asphalt project is installed with precise, high quality work and effort. When the asphalt project is complete, the crew will clean up the area and make sure the property looks great. There should be no mess left for the homeowner to clean. The asphalt project will be roped off so nobody will walk or drive on the newly laid asphalt.

The contractor will have the homeowner inspect the finished asphalt project. The contractor will show you all the details of your asphalt project. The contractor will allow the homeowner to ask any questions. Lastly, the homeowner will pay the contractor for a quality job well done.

When the asphalt contractor has an open line of communication with the homeowner and provides quality work, then the homeowner will know for certain that the asphalt project has been performed with the highest quality a contractor can supply. The homeowner will be happy that they received a high quality asphalt project that can last them up to 30 years, along with an honest asphalt contractor that they can depend on for future projects.

What Questions Should I Ask An Asphalt Contractor?

An asphalt pavement is an important decision for a homeowner. The asphalt is what is driven on to get you home. It adds to the appearance of the home, while also providing many benefits for a homeowner, and is why there should be some questions that you should ask your asphalt contractor.

How does a homeowner know which questions are more important than other questions? The truth is, all questions are important to ask. Any time a homeowner is adding anything to their home, they should ask their contractor every question they have.

When the contractor comes to your home to look over the area you would like to have asphalt applied to, have a list of questions ready to ask so you do not forget them. The homeowner should show the area where they would like to add asphalt, allow the contractor to look over the area, and then start asking questions.

“How much will it cost to install the asphalt in this area?” Once the contractor can see the area, they can start figuring the cost of supplies, materials, man power, and equipment needed to do the asphalt project, along with an approximate cost of the project.

“Do you have a license to complete my asphalt project?” The contractor can show the homeowner at this moment if they have a license to perform the asphalt project. Do they have insurance on the equipment and their employees? The contractor should be able to present the insurance for the equipment and employees at this time.

“Do you offer any warranty on the asphalt project?” If there is a warranty included on the asphalt project, the contractor will write it down in the bid and bill for the homeowner. The warranty will be stated clearly on the paperwork.

“How long will it take to have the asphalt project completed?” The contractor will estimate how much time the project will take. The contractor will go over the steps of installing the asphalt and how long each individual step will take.

These questions will cover the major concerns for the homeowner. The contractor can immediately answer and show any documents at this time. The homeowner will be able to decide if this is the contractor that they would like to hire for their asphalt project. This is a big decision for every homeowner, so having a qualified contractor will ease any worries or concerns.

For more information on Arizona’s #1 asphalt company, click here!

What Determines The Price Of My Asphalt Project?

The price of an asphalt project will start off by determining the square foot of the project. The square foot of the project is the area where the asphalt will be added. Other factors that determine the price of an asphalt project include:
* existing sub grade
* permits
* culvert placement
* materials
* time
* equipment
* labor

5-3

The existing sub grade is the area where the asphalt will be installed. The sub grade area should be free of any roots, debris, and should be completely clean. The area will be cleared, cleaned and ready for new asphalt to be applied.

Permits may be needed for asphalt projects that involve adding a culvert to the project. The culvert will allow the water to flow from the asphalt properly. The materials needed for an asphalt project will depend on how thick you want the asphalt to be. Some homeowners prefer having a thicker asphalt, just remember that the added inches will increase the price of the asphalt.

The equipment that needed is essential. Gone are the days when just a wheel barrel and shovel handles an asphalt project. There is a minimum of at least two large dump trucks needed for an asphalt project. Two trucks will keep the asphalt dumping at all times, which is important for the success of the project, as hot asphalt cannot sit in a truck; it needs to be dispensed immediately. Workers will be ready for the hot asphalt. When one truck leaves to get another load of hot asphalt, a truck will be ready to dump fresh hot asphalt.

The amount of time the new asphalt takes to be installed is also factored into the price, along with the labor of the employees performing the work. The number of employees needed for the project will be determined by the contractor. If the project is a large project, then there will be more employees needed, but the more employees needed, the faster the asphalt project will be completed. Insurance will be considered for the project, as the asphalt contractor will have to make sure that adequate insurance is obtained for the project. This is important for both you and your contractor.

The price of an asphalt project has many factors. Don’t let the price of asphalt determine who you hire for your project. An experienced and qualified asphalt contractor knows the importance of each factor for an asphalt project and will want to deliver the best results possible for you throughout the process.

For more information on Arizona’s top trusted commercial asphalt contractor, click here!

Parking Lot Paving Glendale AZ & Sealcoating

Approximately, one year ago, Our team removed the old asphalt in the parking lot, re-graded the base materials, and installed new asphalt.  The two retail establishments of Smart & Final and Trader Joes are side by side and keeping both retail stores happy with the disruption in the parking lot was a challenge, but the project was completed with minimal disruption to their customer’s parking.  We were asked to come back this year and apply a sealcoat to the new asphalt in the parking lot.  Again, because of the two different retail stores that share this same parking area, it was a challenge to carry out this work without inconvenience to each store’s respective customers.  We organized and phased it’s work to make sure convenient parking areas were open at all times for both stores.  The project was completed with only minor inconvenience to each of the retail stores and everyone was happy.

and here is a nice review from the project!

“Young, Swenson, & Cross Paving  has always given us great competitive prices,  outstanding service, and fantastic  results.  Everyone you deal with in their company is a true professional”

Matt Morris
Construction Manager
Koss Real Estate Investments

 

Parking Lot Paving Glendale, AZ  Trader Joes

"*" indicates required fields

REQUEST AN ESTIMATE
This field is for validation purposes and should be left unchanged.

Request Estimate